On November 18, Gonka’s documentation reported that the Ethereum bridge had been suspended following an incident under investigation. It advised users not to use the bridge or trade GNK until further notice.
- LLM tokens this week
- 633.2B DevShard · input + output
- at least Pool trading volume
- $681k Uniswap v3 WGNK/USDT 0.3% on Ethereum
- Reporting period
- 14—20 November 14–20, 2026, UTC
Volume of at least $681.3 thousand
Trading volume in the pool reviewed was at least $681.3 thousand. GNK’s price in that pool at the start of the period was $0.1567. No closing price is available at the period boundary, so the weekly change has not been calculated. These prices do not represent all GNK markets.
Support for the Foundation approved
Proposal No. 119 passed on November 14. It formalizes support for the Gonka Foundation as a foundation promoting Gonka’s long-term development, neutrality, and resilience. Funding is to be addressed in a separate proposal: this vote did not approve a budget.
Asset recovery and compensation criteria
Community discussions relayed claims about asset recovery, uninterrupted network and inference operations, the absence of an open process for compensation claims, and plans for a new bridge. No public confirmation of these claims is available in the accessible sources. A separate discussion concerned a list of affected addresses that still requires verification.
Views on compensation differed. Suggestions included distinguishing between holders from before the incident, limit orders filled afterward, and purchases made during the price decline. Compensation in the original assets rather than GNK was also discussed. These discussions do not confirm that a decision has been made.
Test build and host instructions
A DevShard v7 prerelease was published on November 19 for testing response verification on the testnet, not the mainnet. On November 20, the documentation began recommending 128 GB of RAM for the Network Node and splitting large hardware fleets across multiple participants so that a single failure would affect a smaller share of the hardware.
An explainer video about Gonka and a guide to becoming a host using GNOT, an independent community tool, were published on November 16. According to its description, the guide covers server and wallet setup and launching a node. The walkthrough was recorded on November 14, before its publication date.